What are the precautions in the loading and installation of gas-fired 2000 kg steam boilers?

Gas-fired steam boilers are a very wide range of special equipments, widely used in food, chemical, paper, textile, construction and other industries. In the process of loading and installing a gas steam boiler, some problems must be paid attention, otherwise it may cause a certain degree of economic loss.

1. Pay attention to the following matters during the loading and unloading and handling of gas-fired boilers: the lifting capacity of the lifting equipment should match the weight of the lifting boiler. The lifting lug on the boiler with the lifting lugs that cannot be used for lifting can not be used for lifting. The length of the steel cord should be reasonably selected to avoid the scratching of the furnace due to the improper length of the steel cord. The boiler must be protected from any damage during handling and handling.

2. Reserves for maintenance space When installing boilers, ensure that there is sufficient maintenance space around the boiler.

3. Setting and precautions for the base and base of the gas steam boiler The boiler body must be installed on the basis of 100-150mm above the floor of the boiler room. It must be confirmed with the technical personnel of the boiler manufacturing company in advance and constructed according to the basic drawings. The anchor bolts must be reserved on the foundation. The foundation shall be capable of withstanding the maximum weight of the boiler and the amount of water it holds. When installing the base, you must first position it. After positioning, adjust to the same length of the two diagonals of the base, and then tighten all the fixing bolts. The installation of the base is carried out with reference to the reference line.

4, general precautions Be careful not to tilt and impact the boiler and accessories too much. No combustibles can be placed around the boiler. Do not use oil and water to smother the boiler. The boiler should normally be installed in a separate boiler room. The new gas-fired boiler room should not be connected to the house. The boiler room shall not be connected to Class A, Class B and Category C fire hazard rooms using flammable liquids. If connected to other production plants, the application firewall is separated.

5. The fire resistance grade and fire protection requirements of the boiler house building shall comply with the requirements of the Code for Fire Protection of Building Design and the Code for Fire Protection Design of High-rise Civil Buildings. The ground of the gas steam boiler room should be flat, non-flammable, no water accumulation, and the foundation load should meet the requirements. The power supply voltage of the gas steam boiler room should be stable to avoid causing the electrical components to burn out. If the voltage is unstable, it is recommended to install a voltage regulator. Ventilation equipment should be installed in the boiler room, and the boiler should be kept at room temperature below 50 °.

Pressure boilers Products of the non-pressure hot water boiler, also called pressure boilers, boiler usually refers to the top does not bear the water column static pressure of the heating system. That is quite an open hot water tank. Meaning pressure boiler: boiler body opening to the atmosphere. In any conditions, the boiler at the water line are zero gauge pressure boiler. Pressure boilers Model consists of three parts, connected by a hyphen between the parts. Categories: pressure hot water boiler is mainly classified by fuel can be divided into CLDR (CWDR) often piezoelectric hot water boiler, CLHS-YQ (CWNS-YQ) pressure fuel (gas) hot water boilers, pressure coal-fired hot water boilers. Model: The first part of the model by atmospheric pressure boiler code, pot-type code, combustion equipment code, the rated thermal power four sections. Boiler pressure is represented by C code example: CLSG0.35; 95/70; W12 represents a vertical pipe fixed grate boiler pressure, the rated thermal power of 0.35 mW, rated outlet water temperature was 95 deg.] C, the nominal temperature of the water inlet. 70 ℃, burning anthracite class I, a second design of the boiler. Product Structure: The overall structure of pressure boilers and boiler auxiliary equipment including two parts. Boiler furnace, drum, burner, water wall superheater, economizer, air preheater, and the furnace wall, etc. The main frame member constituting the core part of the steam production, called boiler. Boiler body is in two main parts and drum furnace. Also known as the furnace combustion chamber, fuel combustion for space. The solid fuel on to the grate, referred to as a fire bed combustion furnace Stoker, also known as fire bed furnace; solid fuel furnace liquid, gas or pulverized, is injected into the combustion chamber is called the fire chamber burner, also known as the furnace fire chamber; air coal particles burn hold it was boiling, and the furnace is inferior fuel suitable for combustion is called fluidized bed furnace, also called fluidized bed furnace; coal particles so that an air flow rotated at high speed, and strongly called fire cylindrical cyclone furnace hearth. Furnace design needs to fully consider the characteristics of the fuel used. Each boiler should be fueled with the original design of the fuel. Boilers running economy and reliability are likely to vary greatly reduced when using the characteristics of fuel combustion. And the natural circulation drum is repeatedly forced circulation boiler receiving feedwater to the economizer, the coupling cycle and supplying saturated steam superheater cylindrical vessel. Simplified drum made from high quality steel plate, is one of the heaviest components of the boiler. Safety knowledge; boiler is a high-temperature, high-pressure thermal equipment, is one of special equipment, widely used in government agencies, public companies and all walks of life, are dangerous and special equipment. Event of an accident involving public safety, it will cause huge losses to the state and people's lives and property. For public safety, people's lives and property safety, according to the State Council, "Regulations on Safety Supervision of Special Equipment", the boiler should use full attention the following matters: 1, should be accompanied by safety technical specifications of the factory boiler design documents, product quality certification, safety and the use and maintenance instructions, supervision and inspection certificate (safety supervision, inspection and performance certificate). 2, boiler installation, maintenance, alteration. Engaged in the installation of the boiler, maintenance, renovation of the unit shall obtain special equipment installation and maintenance certificates issued by the Provincial Quality and Technical Supervision, before engaging in the boiler installation, maintenance, alteration. Construction unit before construction will be prepared for installation, maintenance, alteration in writing inform the special equipment safety supervision and management department of the municipality or district, and will start informing sent to the local county level Quality and Technical Supervision for the record, told immediately after construction. 3, inspection of boiler installation, maintenance, transformation. After construction, the construction unit To State Quality and Technical Supervision of Special Equipment Inspection and hydrostatic testing of the boiler installation supervisory inspection declaration. After passing by the State Quality and Technical Supervision, State Special Equipment Inspection, County of Quality and Technical Supervision involved in overall acceptance. 4, registration boiler. After the boiler inspection, the use of units must be in accordance with the "special equipment registration and use of management rules", fill "boiler (census) Registration Form", the State Quality and Technical Supervision to register and obtain a "registration certificate to use special equipment safety . " 5, operation of the boiler. Boiler operation must be performed by trained and qualified to obtain "special equipment operator certificate" certified personnel to operate, must strictly abide by the rules and eight systems, six record. 6, check the boiler. Periodic inspection of boiler once a year, not be used without safety periodic inspection of boilers. Safety accessories safety valve of the boiler regular inspection once a year, pressure gauge biannually verified, may not be used without the periodic inspection of the safety accessories. 7, non-pressure boilers will be installed for the boiler pressure. Do not use water level gauge, safety valve, pressure gauge three safety accessories insufficiency boiler. Daily operation and maintenance: ⒈ chemical contact, turbine attendant prepare enough desalinated water, oxygen, water passing temperature no higher than the drum wall temperature 50 ℃; Sheung during hot water temperature should not be to the drum wall metal temperature difference greater than 40 ℃ .⒉ new installation or after recording before overhaul boiler Feed expansion departments indicated .⒊ Sheung summer time less than 2 hours, at least 4 hours in winter, when the temperature and Sheung drum wall temperature difference of less than 40 ℃ how reheater be preserved? ⒈ turbine after playing brakes, boilers ensure a blower, an induced draft fan is running the best cross reserved two oil gun .⒉ open reheaters to the empty exhaust steam reheater hydrophobic doors and air doors corrosion, anti-corrosion of the reheater steam temperature is lower than a predetermined deg.] C for 400 .⒊ control drum water level within the permissible range .⒋ preservation time less than 20 minutes after stopping two oil gun operation guaranteed .⒌ when the furnace pressure 50--100Pa, each of the flaps open, baffle for ventilation less than 5 minutes, stop sending, fan, each of the flaps closed tailgate may be appropriate to accelerate Sheung speed.

When the external inspection of the 2000 kg steam boiler few notes below Henan fast boiler's steam boiler Xiao Bian told you about the external examination of the few notes need to be transported when the steam boiler, it is necessary to check the external steam boiler, 1, security accessories are complete, sensitive, reliable, secure attachment of the installation for compliance with relevant regulatory requirements. 2, can test gauge when necessary, the safety valve exhaust test. 3, auxiliary equipment (fans, pumps) is functioning properly. 4, automatic control equipment, signal systems and a variety of instruments is sensitive and reliable. 5, various types of door is tight, leaks and corrosion. 6, placed in the drum to the combustion chamber wall may be observed, water wall is normal, without deformation or other anomalies. 7, the combustion is stable, whether black smoke chimney. 8, steam boiler furnace wall, architecture, platforms, escalators, etc. is intact: water treatment equipment is operating properly. 9, boiler room facilities for compliance with relevant regulatory requirements, management is normal and so on. 10, the visible parts of the boiler weld cracks cracks (joints) appears. Classification of a steam boiler combustion apparatus, the four-way steam boilers for solid fuel burner layer being layered on the furnace grate stratified charge combustion. Such as: hand-burning stove, chain furnace stoker furnace. Second, the four-way chamber burner fuel mist of fine particles with the air injected into the furnace combustion furnace in suspension. Such as: Pulverized Coal, oil furnace, gas furnace or the like. Three, four boiling furnace fuel stream is lifted carrying like rolling boil under goes a combustion furnace.

Such as hotel Home Hotel Group is one of the three major brands, in 300 cities in the country has nearly 2,000 hotels. Home Inns has won China Golden Pillow Award for Best Chinese economy hotel chain brand award, in 2014, Home Inns brand value of $ 420 million of selected China's top 100 brands. April 4, 2016, BTG hotel groups such as the privatization of the hotel purchase transaction has been completed delivery. In mid-2016, as a Beijing hotel with our preliminary communication, the urgent need two boilers work of heating and hot water supply. I related technical engineers and recommend it to calculate the number and size of the boiler on the hotel room as hotel Willy sharp V6-99 two models.

Contact

Contact Form

Address

Related Information

natural gas burners boilers 2000kg

where are boilers made in pakistan | Steam Boiler I. natural gas burners boilers 2000kg in pakistan Made natural gas burners boilers 2000kg in pakistan Dodgy old boiler Nick Kaijaks So, yesterday, we woke up thinking, gosh, its a bit fresh this morning.boiler wood pellets

Online chat

Steam Flows Through A Power Plant At A Rate Of 50

Steam flows through a power plant at a rate of 50 kg/s. The enthalpy change across the boiler is 2000 kJ/kg. a. If the boiler is 90% efficient and Natural Gas (Heating value = 55 MJ/kg) is the fuel used in the boiler, determine the required gas consumption rate.

Online chat

Steam Boilers - Parker Boiler Co. | Industrial

STEAM BOILERS The Parker Boiler water tube design offers an extremely efficient, reliable steam boiler. The Parker Boiler water tube design offers an extremely efficient, reliable steam boiler built for the long term and ease of maintenance. The Parker Boiler design offers many advantages. Compare ours to the competition.

Online chat

Steam boiler solutions - Atlas Copco UK

Maximum capacity ranging from 1,300 kg/h to 6,000 kg/h Maximum steam pressure from 14 barg to 25 barg Duel Fuel burner (natural gas or light fuel oil) Up to 72 hours of unsupervised operation; No special convoy required for boilers up to 6,000 kg/h Optional accessories for a complete set-up

Online chat

Waste heat and water recovery from natural gas boilers

1. Introduction. Fossil fuels including oil, coal and natural gas are the prime energy sources for various energy systems from motor vehicles, combined heat and power plants, steel production, to chemical processing .In the past decades, the energy consumption by fossil fuel boilers kept increasing, and a large quantity of waste heat was dissipated without being recycled, .

Online chat

Steam Boiler Questions and Answers

Before you start raising the level in the boiler you have to find out if any part of the furnace walls has been overheated. If you raise the level over a glowing steel-wall then the boiler might produce more steam than the safety valves can handle and a nasty explosion would be the result. Boiler Questions and Answers

Online chat

PDF CBEX ELITE - Cleaver-Brooks

Boiler Room Size 12 CBEX Elite Natural Gas Estimated Emission Levels 13 Altitude Correction for Gas 13 Predicted Fuel-to-Steam Efficiencies - Natural Gas 13 Gas Train (Siemens) 14 150-200 psig steam (1800-2000 hp) 150-190 psig steam (2200 hp) Full modulation, all sizes.

Online chat

Steam boilers | Products | Commercial & Industrial

Bosch steam boilers generate process heat with output ranges from 175 to 55,000 kilograms per hour and are universally applicable. The sizing and equipment level of the products are designed to individual customer specification with many different options and variants available.

Online chat

Industrial Gas Burner 2000kg Hr Steam Boiler Price - Buy

Industrial Gas Burner 2000kg Hr Steam Boiler Price, Find Complete Details about Industrial Gas Burner 2000kg Hr Steam Boiler Price,2000kg Hr Steam Boiler,Natural Gas Steam Boiler,Gas Or Oil Fired Commercial Use Steam Boiler from Boilers Supplier or Manufacturer-Wuxi Zozen Boilers Co., Ltd.

Online chat

Used Boilers | Buy & Sell | EquipNet

Hurst Boiler and Welding Company is a global manufacturer and provider of a range of industrial boilers including gas boilers, oil boilers, solid waste boilers, steam boilers, and much more. Hurst offers a complete line of high performance equipment for a number of boiler needs.

Online chat

2 Ton Oil And Gas Fired Steam Boiler Once Through Water

Automatic gas fired high efficiency once-through LSS Type boiler is a new type of high-tech energy saving product. It can produce steam in cold water condition within 3-5 minutes.While the traditional oil/gas fired boiler generate steam will take 30-40 minutes.

Online chat

Boilers, Weil Mclain Boilers, Burnham Boilers, Natural Gas

As an example, if you have a 2,000-square-foot house in a moderate climate, you need a boiler that can produce approximately 70,000 BTUs. Burnham SIN5LNI-LE2 SIN5LNILE2 SIN5LNI Independence 86,000 BTU SemiPak Steam Boiler NG. Regular Price In Stock. Lochinvar Knight XL KBN501 406000 BTU High Efficiency Boiler Natural Gas. 1 Review(s

Online chat

Gas Boilers 5000 Kg H - ferienwohnung-ruegen-putbus.de

steam boiler 500 kg hr pdf - bkrkunst.nl. steam boilers - Aalborg Industriesboilers in South America Fire tube boilers for burning oil, gas and dual fuel . 500 . 650. 800. 1000. 1300. 1600. 2000. Steam Productionr (water 80º) kg / h . 550.Images for steam boiler 500 kg hr pdfInstant Steam. Get A Quote

Online chat

5000 Kg Per Hour Steam Boiler - WHGLA

gas fire steam boiler 300 kg per hour - imrcollege.in. 4000 kg hr gas boiler Boiler In Textile Factory. Source a Large Selection of 4000 Kg Per Hour Coal Fired Boiler Products at gas fired steam boiler fire tube boiler capacity 3000 kgshr Industrial Steam boiler with a capacity of up to 2000 Kg Steam boiler with a capacity of 2000 Kg Steam per hour

Online chat

Gas Steam Boilers - eComfort

Steam boilers are a common way to heat buildings across the United States, and gas fired steam boilers are the most popular type. Shop our wide selection of gas fired steam boilers from the top manufacturers in the industry.

Online chat

Project